A design-build contract puts design and construction under one agreement with one team. Before you sign, check what the team will design and build, when you approve the design and price, how changes and payments work, and what happens if the project stops. A single contract can simplify coordination, but it does not replace a clear scope or a careful review.
This guide offers questions for a Texas commercial owner to bring to a contractor and a construction attorney. It is not legal advice; answers depend on the agreement and project.
Start with the work, not the price
What exactly is included?
Ask for the owner's project criteria and the list of work the design-builder will deliver. Those may include the intended use, site information, building size, performance needs, permit responsibilities, drawings, construction work, and closeout documents. Mark any owner-supplied work or separate contracts. A short phrase such as “turnkey building” does not tell you who pays for utility connections, owner equipment, or work outside the building footprint.
The American Institute of Architects' A141–2024 summary describes owner's criteria as the basis for preliminary design and a later price proposal. Ask what information the price is based on.
Pro tip: Make two lists during the first scope review: “included” and “not yet decided.” Ask when the second list must be resolved and how a decision will affect price and schedule. An allowance or assumption is not the same as a finished selection.
Who is responsible for the design team?
Under design-build, the owner works with one contracted design-builder for design and construction. The Design-Build Institute of America explains that single contract as the core difference from other delivery methods. Ask who will coordinate the architect and engineers, who will submit drawings, and who will respond to plan-review comments. Check the contract documents rather than assuming that “one team” means every discipline is performed in-house.
Aday & Associates describes its coordination of design, permitting, and construction on its design-build service page. Your agreement must still define the scope for your build.
Did you know? A design-build agreement can be signed before the final construction price is set. The AIA's A141–2024 description includes a later design-build amendment that records the agreed contract sum and the information behind it. Ask which stage of work you are authorizing now and what still needs your approval.
Find the owner's decision points
When do you approve the design and construction price?
A retail owner may know the opening date before the drawings are ready. A preliminary budget is not a promise that every choice has been priced. Ask what drawings, site findings, and selections must be ready before the construction price is proposed. How do you approve or decline the next phase?
The AIA summary describes preliminary design, a price proposal, and an amendment upon mutual agreement. Your contract may differ. What are you committing to today, and what requires another written decision?
Pro tip: Put each approval checkpoint beside the project schedule. If a decision on storefront materials or mechanical capacity is due before pricing, identify who will bring options and what happens if the choice comes later. A deadline with no decision owner is a risk to the schedule.
What happens to the budget when the design changes?
Ask how the contract distinguishes an owner-requested change from work already required by the agreed scope. Check who can request a change, who prices it, and whether work may proceed before you approve the cost and time effect in writing. Also ask how allowances, unknown site conditions, and material substitutions will be handled. The answer should be visible in the contract, not left to a hallway conversation.
Aday's construction cost breakdown explains why early estimates can move as the design and site become clearer. Ask for the assumptions behind each number. A “fixed” price still needs a defined scope and change process.
Did you know? The price in a design-build proposal may be developed after the first round of design work. The AIA's A141–2024 summary describes a contract-sum amendment and notes that the cost of the work may be handled with or without a guaranteed maximum price. Do not assume that every design-build offer uses the same price model.
Read the payment and schedule terms together
What are you paying for at each stage?
Separate the fee for early design or preconstruction from the payment plan for construction. Ask when invoices are due, what progress each invoice represents, what documentation you receive, and whether retainage or allowances apply. Confirm how the final price is established if it is not known at the first signature. A payment schedule should match the work and the written approval points, not just a set of calendar dates.
A construction attorney can explain the proposed clause and Texas-specific issues; the contractor can explain its billing process.
What moves the completion date?
Look for a realistic sequence: design, owner decisions, permits, procurement, site work, construction, inspections, and closeout. Ask which dates are targets and which are contractual commitments. Check how a delay is reported, how schedule changes are approved, and what happens when the owner changes scope or an outside review takes longer than expected.
Aday's pre-construction consulting page describes early work on budgets, schedules, and risk. Ask whether unresolved site or design questions should be answered before a construction commitment.
Pro tip: Ask for a sample project update before you sign. Look for open decisions, pending approvals, budget changes, and the next schedule milestone. This tells you how the team plans to keep you informed when the project is underway.
Check your rights at handoff and if plans change
What will you receive when the job is done?
Ask what drawings, warranties, manuals, inspection records, and closeout items the agreement calls for. If you might pause the project after design, ask what right you have to use the plans and what fees or permissions that use requires. The answers may depend on agreements with the design professionals as well as the owner–builder contract; do not assume you own every drawing merely because you paid for design work.
Review the process for a dispute, pause, or termination: notice, payment, and handoff of records. Have an attorney review those clauses.
Did you know? “Single point of accountability” describes the delivery structure; it does not mean an owner has no decisions to make. A clear agreement names the owner's criteria, approval steps, and information the owner must provide. That makes collaboration easier to manage, even when one team coordinates the work.
Five questions to take into the meeting
- Which scope items, site work, and owner purchases are included or excluded?
- What design will we review before we agree to the construction price?
- How will we approve changes to scope, cost, or time in writing?
- What documents support each payment and each schedule update?
- What happens to the drawings, work, and payments if the project pauses?
Compare the answers with your site, budget, and opening date. Leave knowing what you are buying and which decisions are still ahead.
Yes, design-build generally puts both services under one agreement with the design-builder. The builder may coordinate outside design professionals, so ask how those relationships and responsibilities are described in the project documents.
Not necessarily. Some agreements authorize early design work and set the construction price later through a written amendment; others may follow a different process. Check the exact commitment and approval steps in your proposed agreement.
Usually a change process is available, but the price and schedule effect depends on the agreement and the stage of work. Ask for a written proposal and approval path before assuming a requested change is included.
Yes, a construction attorney can explain the terms, risks, and Texas-specific issues in the actual agreement. A contractor can walk you through its process, but that discussion is not a substitute for independent legal advice.
Make the agreement match the project
The best next step is to compare the proposed scope, approval points, payment terms, and schedule with the project you actually intend to build. Mark every assumption you cannot verify, then ask the design-builder how it will be resolved before you commit. If a key answer is not written down, request a revision and have counsel review it.
Aday & Associates works with Central Texas commercial owners on design-build projects from early planning through construction. Contact the Aday team to discuss your project goals, site, and timing, and to learn how its contract process would apply to your build.